Download
PDF Brochure

9919logo

 Location
 9919 Jefferson Boulevard
 Culver City, California 90232

 Project Size
 132,387 RSF

Floor Sizes
North Building: 1st       23,827
2nd      23,827
3rd       23,827
Total    71,481

South Building: 1st       20,306
2nd      20,306
3rd       20,306
Total    60,906

 Parking
 Ratio of 3.0 cars / 1,000 RSF

 Proposed Amenities
 Designed to accomodate on-site
 food service / coffee bar

 Access
 Signalized entry from Jefferson Blvd.

 Project Occupancy / Status
 Ready to start construction;  to be
 completed 14 months after lease execution

 streetview

 Architect
 Steven Ehrlich Architects

 Design Material
 Progressive exterior of architectural steel
 framing, green tinted solar glass, and a
 signature mosaic panel system. Concrete
 floors, ceilings, columns and balconies.

 Building Features

  •   Exterior walkways and corridors.
  •   Two levels of subterranean parking.
  •   Spacious outdoor courtyard with
        seating and lush landscaping.
  •   Full height glass windows.
  •   Project to be LEED certified.